Scheduled Power Interruptions (2007)

Power may be interrupted at any time during the scheduled period. Power may be restored earlier than scheduled. Therefore, please consider our lines and equipment energized at all times and take all necessary precautions.

DateDayTimeDurationAreas affectedPurpose
March 8, 2007Thu5:30 am – 6:00 am
7:00 am – 7:30 am
30 min
30 min
Dagupan City:Caranglaan-Tebeng, Balani, Manguin, Bolosan, Tambac, Salisay, Mamalingling, A.B. Fernandez East, A.B. Fernandez Ave. from Jollibee to Quintos Bridge (portion only), Nable St., Pantal, Guibang, Quattro Grill, Colegio de Dagupan, and Silverio's Restaurant
Upgrading of primary lines.
5:30 am – 7:30 am2 hr
Dagupan City:Herrero St.
March 13, 2007Tue1:00 am – 4:00 am3 hr
Sta. Barbara:Minien East (Wedgewood Heights Subdivision only)
Primary line extension.
March 27, 2007Tue6:00 am – 8:00 am2 hr
Calasiao:San Miguel, Parongking, Ambunao-Cruz, and Sitio Balagan, Cabilocaan, Bued, Quesban, Alibago, Gabon, and Coca-Cola Plant
Primary line extension and revamp.
8:00 am – 4:30 pm8.5 hr
Dagupan City:Salapingao, Dupo, Suit, and Pugaro
Primary line conversion from one- to two-wire single phase.
March 30, 2007Fri8:00 am – 6:00 pm10 hr
Manaoag, San Jacinto, and San Fabian: All areas except Longos, Sabangan, Nibaliw, Caballero St., and portion of Real Highway
Laoac:Inmanduyan and Sitio Columbino (PANELCO III customers)
Interruption by TransCo for annual preventive maintenance of transformer at San Manuel Substation.
April 4, 2007Wed8:00 am – 12:00 nn4 hr
Manaoag:Pugaro
Primary line extension.
April 17, 2007Tue9:00 am – 4:00 pm7 hr
San Fabian:Nibaliw Vidal (Nibaliw West or Center Beach), Nibaliw Magliba, and Nibaliw Narvarte (Sabangan)
Primary line revamp.
April 19, 2007Thu9:00 am – 4:00 pm7 hr
San Fabian:Crusaders of the Divine Church of Christ (CDCC) church and Nibaliw Narvarte (Sabangan)
Primary line upgrading and extension.
April 20, 2007Fri9:00 am – 3:00 pm6 hr
Dagupan City:Suit and Pugaro
Primary line revamp.
April 23, 2007Mon8:00 am – 4:30 pm8.5 hr
San Fabian:Crusaders of the Divine Church of Christ (CDCC) church and Nibaliw Narvarte (Sabangan)
Upgrading of primary lines.
April 24, 2007Tue9:00 am – 4:00 pm7 hr
Manaoag:Sta. Ines
Laoac:Calmay (PANELCO III customers)
Primary line revamp.
April 25, 2007Wed8:00 am – 4:30 pm8.5 hr
San Fabian:Crusaders of the Divine Church of Christ (CDCC) church and Nibaliw Narvarte (Sabangan)
Upgrading of primary lines.
April 27, 2007Fri8:00 – 9:00 am1 hr
San Fabian:Nibaliw Center, Sagud-Bahley, Nibaliw Vidal (Nibaliw West or Center Beach), and Nibaliw Magliba except Crusaders of the Divine Church of Christ (CDCC) church
Upgrading of primary lines.
8:00 am – 4:30 pm8.5 hr
San Fabian:Crusaders of the Divine Church of Christ (CDCC) church and Nibaliw Narvarte (Sabangan)
May 8, 2007Tue8:00 am – 4:30 pm8.5 hr
Dagupan City:Doña Margarita Subdivision, Sitio Puelay (portion only), and Caranglaan
Primary line extension.
8:30 am – 9:30 am
3:30 pm – 4:30 pm
1 hr
1 hr
Calasiao:All areas except Gabon, Bued, and Quesban
Primary line revamp.
8:30 am – 4:30 pm8 hr
Calasiao:Doña Maria Subdivision, Sitio Camangaan, and Doyong
8:00 am – 4:30 pm8.5 hr
Calasiao:Dinalaoan, Dinalaoan Riverside, Sitio Alegria, Lumbang, Sitio Guam, Sitio Laguinlin, Ambuetel, and Sitio Garcia
May 10, 2007Thu8:00 am – 6:00 pm10 hr
Manaoag, San Jacinto, and San Fabian: All areas except Longos, Sabangan, Nibaliw, Poblacion, and portion of Real Highway
Laoac:Inmanduyan, Sitio Columbino, and Calmay (PANELCO III customers)
Interruption by TransCo to replace rotten wood poles, rotten crossarms, and broken insulators along Manaoag-San Jacinto-Mangaldan 69 kV line segment.
May 11, 2007Fri5:00 am – 5:15 am
7:15 am – 7:30 am
15 min
15 min
Calasiao:All areas except Cabilocaan, San Miguel Highway, Gabon, Bued, and Quesban
Dagupan City:De Venecia Highway, Inn Asia, Dagupan City Water District (DCWD) at Siapno Rd., Bacayao Sur, Tocok, Lasip Grande, Pogo Grande, Zamora Ext., Zamora St. cor. Perez Blvd. up to YMCA, Burgos St., Guilig, Pogo-Guilig, Malued, Lasip-Chico, Tapuac, Amado-Tapuac, and Careenan
Replacement of a substation protective device.
8:00 am – 4:30 pm8.5 hr
Calasiao:Dinalaoan, Dinalaoan Riverside, Sitio Alegria, Lumbang, Sitio Guam, Sitio Laguinlin, Ambuetel, and Sitio Garcia
Primary line revamp
May 18, 2007Fri9:00 am – 3:00 pm6 hr
San Jacinto:Sitio Boquig and Macayug
Primary line revamp.
May 28, 2007Mon8:30 am – 4:30 pm8 hr
Calasiao:Dinalaoan, Dinalaoan Riverside, Sitio Alegria, Lumbang, Sitio Guam, Sitio Laguinlin, Ambuetel, and Sitio Garcia
Primary line revamp.
June 1, 2007Fri8:00 am – 12:00 nn4 hr
Calasiao:Brgy. Parongking, Santong Noodles, and Nurich Vitameal
Primary line revamp.
June 5, 2007
June 6, 2007
Tue
Wed
9:00 am – 4:30 pm
9:00 am – 4:30 pm
7.5 hr
7.5 hr
Manaoag:Sitio Palawan, Sitio Daya, and Sitio Malicdem
Primary line conversion from one- to two-wire single phase.
June 7, 2007Thu8:00 am – 4:00 pm8 hr
Sta. Barbara:Malanay, Gueguesangen, and portion of Nilombot
Replacement of rotten primary poles.
June 14, 2007Thu8:00 am – 6:00 pm10 hr
Dagupan City, Calasiao, and Sta. Barbara: All areas
San Fabian:Parac-parac, Longos, Cayanga, Nibaliw, and Sagud-Bahley
Interruption by TransCo to correct various 230 and 69 kV hotspots and to do maintenance of Labrador-Calasiao 69 kV transmission line.
June 23, 2007Sat6:00 am – 8:00 am2 hr
Dagupan City:Guilig, Pogo-Guilig, Malued, Perez Blvd., Rizal Ext., Burgos St., Tapuac, Amado, Malta Village, Careenan St., Bonifacio St., Galvan St., Nueva St., Fernandez St. (portion only), and CSI Market Square
Line reconfiguration (load shifting).
June 25, 2007Mon8:00 am – 11:00 am3 hr
Sta. Barbara:Brgy. Butao
Tree trimming.
June 25, 2007
June 27, 2007
June 29, 2007
Mon
Wed
Fri
8:30 am – 4:30 pm
8:30 am – 4:30 pm
8:30 am – 4:30 pm
8 hr
8 hr
8 hr
Dagupan City:Purok China, Purok Japan, Bureau of Fisheries and Aquatic Resources (BFAR), and Bonuan Binloc
Primary line revamp.
July 5, 2007Thu8:30 am – 12:00 nn3.5 hr
Calasiao:Banaoang, Sitio Cabaruan, and Sitio Calit
Replacement of rotten primary poles.
July 7, 2007Sat3:30 am – 4:00 am
11:00 am – 12:00 nn
30 min
1 hr
Dagupan City:M.H. Del Pilar St., Arellano St., Region I Medical Center, Bonuan Catacdang, Bonuan Gueset, Bonuan Tondaligan, Perez Blvd. (portion only), Nazareth Hospital, Rizal Ext., Galvan St., Nueva St., and CSI Market Square
Replacement of rotten primary poles.
3:30 am – 12:00 nn8.5 hr
Dagupan City:Mayombo, Doña Margarita Subdivision, Dagupan Doctors Villaflor Memorial Hospital (DDVMH), Pag-IBIG Subdivision, Bacayao Norte, Caranglaan, Caniogan, Sanggunian Village, and Bayanihan Village
July 9, 2007Mon8:30 am – 4:30 pm8 hr
Dagupan City:Diamond Village
Upgrading of primary lines.
July 10, 2007Tue8:30 am – 4:30 pm8 hr
Calasiao:Banaoang, Sitio Cabaruan, and Sitio Calit
Upgrading of primary lines.
July 11, 2007Wed8:30 am – 4:30 pm8 hr
Dagupan City:Diamond Village
Upgrading of primary lines
July 12, 2007Thu8:30 am – 4:30 pm8 hr
Calasiao:Banaoang, Sitio Cabaruan, and Sitio Calit
Upgrading of primary lines.
July 13, 2007Fri8:30 am – 4:30 pm8 hr
Calasiao:San Vicente
Replacement of rotten primary poles.
July 16, 2007Mon8:30 am – 12:00 nn3.5 hr
Dagupan City:Diamond Village
Upgrading of primary lines.
8:30 am – 4:00 pm7.5 hr
Calasiao:San Vicente
July 18, 2007Wed8:30 am – 12:00 pm3.5 hr
Dagupan City:Krystaville Subdivision
Relocation of primary pole.
July 19, 2007Thu8:00 am – 5:00 pm9 hr
San Fabian:Erfe St., Rizal St., Lekep-Butao, Alvear St. (portion only), and Tempra-Guilig (portion only)
Replacement of rotten primary poles.
July 20, 2007Fri8:30 am – 4:30 pm8 hr
Sta. Barbara:Villa Sta. Barbara Subdivision and Leet East
Replacement of rotten primary poles.
July 23, 2007Mon8:00 am – 10:00 am2 hr
Calasiao:Sitio Guam, Sitio Leksab, and Dinalaoan
Tree trimming.
1:00 pm – 3:00 pm2 hr
Sta. Barbara:Sitio Tamayo and Cablong
July 24, 2007Tue9:00 am – 3:00 pm6 hr
San FabianSan Fabian Philippine Tourism Authority (PTA) Beach Resort and portion of Bolasi
Replacement of rotten primary poles.
July 26, 2007Thu8:30 am – 4:30 pm8 hr
Sta. Barbara:Malanay, Gueguesangen, and portion of Nilombot
Upgrading of primary lines.
August 1, 2007Wed8:30 am – 4:30 pm8 hr
Calasiao:Pangasinan Village Inn (PVI), Bued (portion only), Quesban, Gabon, and portion of San Miguel
Sta. Barbara:Alibago
Replacement of rotten primary poles.
9:00 pm – 12:00 nn3 hr
Sta. Barbara:Bagong Lipunan Improvement of Sites and Services (BLISS) and Balingueo
Primary line extension.
August 2, 2007Thu8:30 am – 12:00 nn3.5 hr
San Fabian:Sitio Beyeng, Sitio Bitoy, Aramal, Sitio Tandagan, Sitio Colisao, and Palapad
Primary line conversion from two- to three-wire three phase.
8:30 am – 4:00 pm7.5 hr
San Fabian:Sitio Gardonio and Binday
August 7, 2007Tue9:00 am – 12:00 nn3 hr
Sta. Barbara:Minien East (Wedgewood Heights Subdivision only)
Primary line extension.
August 8, 2007Wed12:30 am – 1:30 am1 hr
Dagupan City:Mayombo (portion only), Perez Blvd., Rizal St., Rivera St., Burgos St., A.B. Fernandez Ave., A.B. Fernandez West, Calmay, Carael, Lomboy, Salapingao, Dupo, Pugaro, and Suit
Replacement of rotten primary pole.
12:30 am – 7:00 am6.5 hr
Dagupan City:Fernandez St.
August 10, 2007Fri8:30 am – 4:30 pm8 hr
Sta. Barbara:Gueguesangen
Replacement of rotten primary poles.
August 15, 2007Wed12:30 am – 1:30 am1 hr
Dagupan City:Mayombo (portion only), Perez Blvd., Rizal St., Rivera St., Burgos St., A.B Fernandez Ave., A.B. Fernandez West, Calmay, Carael, Lomboy, Salapingao, Dupo, Pugaro, and Suit
Replacement of rotten primary pole.
12:30 am – 7:00 am6.5 hr
Dagupan City:Fernandez St.
August 17, 2007Fri8:30 am – 4:30 pm8 hr
Sta. Barbara:Gueguesangen
Replacement of rotten primary poles.
August 23, 2007Fri8:30 am – 5:00 pm8.5 hr
Manaoag:Sta. Ines
Laoac:Calmay (PANELCO III customers)
Replacement of rotten primary poles.
8:30 am – 4:30 pm8 hr
Sta. Barbara:Maramba St., Dalongue, Taga-ilog St., Maningding Old Rd., Sapang, Maronong, Payas, Carusucan, Sonquil, Patayak, Cablong, and Balingueo
August 24, 2007Fri8:30 am – 5:00 pm8.5 hr
Manaoag:Sta. Ines
Laoac:Calmay (PANELCO III customers)
Upgrading of primary lines.
12:30 am – 8:00 am7.5 hr
Dagupan City:A.B. Fernandez Ave. (from Rizal St. to Burgos St. only)
Replacement of rotten primary pole.
12:30 am – 1:30 am
7:00 am – 8:00 am
1 hr
1 hr
Dagupan City:Mayombo (portion only), Perez Blvd., Rizal St., Rivera St., Burgos St., Fernandez St., A.B. Fernandez West, Calmay, Carael, Lomboy, Salapingao, Dupo, Pugaro, and Suit
August 28, 2007Tue8:30 am – 5:00 pm8.5 hr
Manaoag:Sta. Ines
Laoac:Calmay (PANELCO III customers)
Upgrading of primary lines.
August 29, 2007Wed8:30 am – 4:00 pm7.5 hr
Manaoag:Sitio Castillo-Cabanbanan, Oraan East, Baguinay, and Matulong
Upgrading of primary lines.
August 31, 2007Fri8:00 am – 4:30 pm8.5 hr
Sta. Barbara:Malanay, Nilombot (portion only), and Gueguesangen
Upgrading of primary lines.
September 4, 2007Tue8:00 am – 12:00 nn4 hr
Calasiao:Parongking (portion only), Santong Noodles, and Nurich Vitameal
Upgrading of primary lines.
9:00 am – 4:00 pm7 hr
Manaoag:Sitio Abalaten and Baritao
Primary line extension.
8:00 am – 12:00 nn4 hr
Dagupan City:Bonuan Boquig (portion only) and Bonuan Longos
Replacement of rotten primary poles.
September 8, 2007Sat8:00 am – 4:00 pm8 hr
Sta. Barbara:Maramba St., Dalongue, Taga-ilog St., Maningding Old Rd., Sapang, Maronong, Payas, Carusucan, Sonquil, Patayak, Cablong, and Balingueo
Replacement of rotten primary poles.
September 10, 2007Mon8:30 am – 5:00 pm8.5 hr
Manaoag:Cabanbanan (Castillo St. only), Oraan West, Baguinay, and Matulong
Upgrading of primary lines.
September 11, 2007Tue8:30 am – 5:00 pm8.5 hr
Manaoag:Cabanbanan (Castillo St. only), Oraan West, Baguinay, and Matulong
Replacement of rotten primary poles.
Dagupan City:Bacayao Norte
Upgrading of primary lines
September 12, 2007Wed8:30 am – 5:00 pm8.5 hr
Manaoag:Baguinay and Matulong
Upgrading of primary lines.
September 13, 2007Thu8:30 am – 10:30 am2 hr
Dagupan City:Calmay Ilocano, Lomboy, Salapingao, Dupo, Suit, and Pugaro
Upgrading of primary lines.
8:30 am – 4:30 pm8 hr
Dagupan CityCarael and Calmay
September 14, 2007Fri8:30 am – 5:00 pm8.5 hr
Dagupan City:Bacayao Norte
Upgrading of primary lines.
September 18, 2007Tue8:30 am – 5:00 pm8.5 hr
Manaoag:Oraan East (portion only), Baguinay, and Matulong
Upgrading of primary lines
8:30 am – 4:00 pm7.5 hr
Dagupan City:Carael and Calmay
September 19, 2007Wed8:30 am – 5:00 pm8.5 hr
Manaoag:Baguinay and Matulong
Upgrading of primary lines.
September 20, 2007Thu8:30 am – 5:00 pm8.5 hr
Dagupan City:Bacayao Norte
Upgrading of primary lines.
September 25, 2007Tue8:30 am – 4:30 pm8 hr
Dagupan City:Bonuan Sabangan
Replacement of rotten primary pole.
8:30 am – 4:00 pm7.5 hr
Dagupan City:Tapuac (Greenfields Subdivision only) and Malued (portion of Calarin Rd. only)
September 26, 2007Wed8:30 am – 4:30 pm8 hr
Dagupan City:Dior Village
Replacement of rotten primary pole.
8:00 am – 12:00 nn4 hr
Manaoag:Galaban St., Aquino St., Baritao, Sitio Madriaga, Aurora Heights Subdivision, San Ramon, and Mermer
Preventive maintenance of line recloser.
1:00 pm – 5:00 pm4 hr
Manaoag:Cabanbanan, Oraan West, Oraan East, Matulong, Baguinay, and Lelemaan
Laoac:Calmay (PANELCO III customers)
September 27, 2007Thu8:30 am – 4:30 pm8 hr
Dagupan City:Bonuan Sabangan
Upgrading of primary lines.
September 28, 2007Fri8:30 am – 4:30 pm8 hr
Dagupan City:Dior Village, Carael, and Calmay
Upgrading of primary lines.
October 1, 2007Mon8:30 am – 4:30 pm8 hr
Dagupan City:Dior Village
Replacement of rotten primary poles.
October 2, 2007Tue8:30 am – 4:00 pm7.5 hr
Dagupan City:Bonuan Sabangan and Las Vegas St.
Upgrading of primary lines.
Dagupan City:Tapuac (Greenfields Subdivision only) and Malued (portion of Calarin Rd. only)
Replacement of rotten primary poles.
October 3, 2007Wed8:30 am – 4:30 pm8 hr
Dagupan City:Dior Village
Replacement of rotten primary poles.
October 4, 2007Thu8:30 am – 4:00 pm7.5 hr
Sta. Barbara:Maramba St., Taga-ilog St., Dalongue, Maningding Old Rd., Sapang, Maronong, Payas, Carusucan, Sonquil, Patayak, Cablong, and Balingueo
Replacement of broken insulators and upgrading of primary lines.
8:00 am – 10:00 am2 hr
Manaoag:Tebuel
Laoac:Inmanduyan and Sitio Columbino (PANELCO III customers)
Interruption by TransCo to replace rotten 69 kV poles and crossarms.
8:00 am – 2:00 pm6 hr
Manaoag:Cabanbanan (portion only) and Lelemaan
October 5, 2007Fri8:30 am – 4:30 pm8 hr
Dagupan City:Dior Village
Upgrading of primary lines.
October 17, 2007Wed8:30 am – 2:00 pm5.5 hr
Dagupan City:Dior Village
Upgrading of primary lines.
October 18, 2007Thu8:00 am – 3:00 pm7 hr
Manaoag, San Jacinto, and San Fabian: All areas except Longos, Sabangan, Nibaliw, Poblacion, and portion of Real Highway
Laoac:Inmanduyan, Sitio Columbino, and Calmay (PANELCO III customers)
Interruption by TransCo to replace rotten wood poles, rotten crossarms, and broken insulators along Manaoag-San Jacinto-Mangaldan 69 kV line segment.
October 24, 2007Wed6:00 am – 8:30 am2.5 hr
Dagupan City:Bonuan Gueset (from Amigo gasoline station to Blue Beach Subdivision only), Bonuan Boquig, and Bonuan Binloc
San Fabian:Longos, Cayanga, Sagud Bahley, Nibaliw Vidal, Nibaliw Narvarte, Nibaliw Center, Nibaliw East, and Caballero St.
Primary line extension.
6:00 am – 8:00 am2 hr
Sta. Barbara:All areas
Upgrading of primary lines.
6:00 am – 12:00 nn6 hr
Sta. Barbara:Poblacion Norte, Poblacion Sur, and Maningding Old Rd. (portion only)
Withdrawal of primary line due to rehabilitation of Maramba Bridge.
October 25, 2007Thu6:00 am – 8:00 am2 hr
Dagupan City:Burgos St., Perez Blvd (from Magsaysay Bridge to Burgos St. only), Zamora St. (portion only), Galvan St., and Rizal Ext.
Upgrading of primary lines.
November 19, 2007Mon8:30 am – 4:30 pm8 hr
Dagupan City:Bonuan Gueset (Maligaya St. only)
Upgrading of primary lines.
8:00 am – 4:30 pm8.5 hr
Sta. Barbara:Poblacion Norte and Dalongue
Replacement of rotten primary poles.
9:00 am – 4:30 pm7.5 hr
San Jacinto:Sitio Estaris
Primary line extension.
November 20, 2007Tue8:30 am – 4:30 pm8 hr
Dagupan City:Bonuan Gueset (Maligaya St. only)
Upgrading of primary lines.
November 22, 2007Thu8:00 am – 4:00 pm8 hr
Dagupan City, Calasiao, and Sta. Barbara: All areas
San Fabian:Parac-parac, Longos, Cayanga, Nibaliw, and Sagud-Bahley
Interruption by TransCo to correct various 230 and 69 kV hotspots and to do maintenance of Labrador-Calasiao 69 kV transmission line.
November 27, 2007Tue8:30 am – 4:00 pm
9:00 am – 12:00 nn
7.5 hr
3 hr
Dagupan City:Bonuan Gueset (Maligaya St. only)
Calasiao:Ico Road and portion of Nagsaing
Upgrading of primary lines.
December 4, 2007Tue9:00 am – 3:00 pm6 hr
Sta. Barbara:Minien East (Wedgewood Heights Subdivision only)
Replacement of rotten primary poles.
December 5, 2007Wed9:00 am – 4:00 pm7 hr
Calasiao:Songkoy
Replacement of rotten primary poles.
December 7, 2007Fri1:00 am – 2:00 am
7:00 am – 8:00 am
1 hr
1 hr
Dagupan City:Rivera St., Zamora St., Burgos St. (portion only), Burgos Ext., A.B. Fernandez Ave., A.B. Fernandez West, Calmay, Carael, Talaib-Tocok, Lomboy, Salapingao, Suit, and Pugaro
Primary line extension.
1:00 am – 8:00 am7 hr
Dagupan City:Mayombo, BHF Administration Bldg., Perez Market Site, Perez Blvd., Rizal St., Rizal Ext., Galvan St., Nueva St., CSI Market Square, Fernandez St., and Burgos St. (portion only)
December 18, 2007
December 19, 2007
December 20, 2007
Tue
Wed
Thu
8:30 am – 4:00 pm
8:30 am – 4:00 pm
8:30 am – 4:00 pm
7.5 hr
7.5 hr
7.5 hr
Manaoag:Oraan West and Oraan East (portion only)
Upgrading of primary lines.
December 19, 2007Wed6:00 am – 7:00 am1 hr
Calasiao:San Miguel (portion only), Bued, Quesban, Gabon, Pangasinan Village Inn, and Coca-Cola plant
Replacement of rotten primary pole.
December 27, 2007Thu8:30 am – 4:30 pm8 hr
Manaoag:Oraan West and Oraan East (portion only)
Upgrading of primary lines.